petertan.com icon

Archive for July, 2007


Total pages: [5]<<12345>>

In Memoriam - Mum’s Fourth Death Anniversary

Thursday, July 12th, 2007

Four years have passed yet the pain remains. Each time thoughts of you filled my mind, I wondered if I had done enough – enough in fulfilling my duty to you as a son; enough in making you comfortable during those final months; enough in easing the agony that cut through your very soul each time the effects of the painkillers wore off.

I blame myself. I blame myself that I did not spend more time with you. I thought you were going to recover. I thought we had more time. I was wrong. Time was never on our side. You left. And life was never the same again.

There were times when I desperately wanted to remember that one moment you said, “Don’t go. Come sit here.”

You were already bedridden then. Tried I did but there is no recollection of what happened. Did I sit by your side? Did we have a conversation? I do not remember. I do not remember. I DO NOT REMEMBER!!! I mourn for that gap in my memory, the one that would have meant a lot to you as it was to me.

Four years have passed. I miss you now as much as I missed you four years ago. Never a day passes without me praying that you are well where you have gone to. May the Lord’s perpetual light shine upon you. Rest in peace Mum. You are truly home now.

Slow Journey Back To KL

Tuesday, July 10th, 2007

After two full days of resting, I have finally recovered from my trip to Penang. It was not so much the driving that wore me out but the massive crawl on the way back. The first began right after the Menora Tunnel exit going downhill to Jelapang. It was a 2-car fender bender on the right lane that caused more than a 1 kilometer crawl.

Just after the KM399.1 marker at the Ulu Bernam rest stop, we were caught in another crawl. This extended for 15 kilometers caused by a four-car pile-up on the right lane too. Not far from that point, the traffic was slow moving again albeit a shorter crawl. It was a 3-car pile-up. And we could not believe it when we saw another collision just a short distance down away. Fortunately, this was at a wider stretch of the expressway and did not cause another jam.

Wuan and I had anticipated that we would reach home by 8.00 pm. We arrived at 10.00 pm. Nevertheless, we were glad to be able to reach home safe and sound. We are already planning another trip back for the Feast of St. Anne at Bukit Mertajam later this month.

To Penang We Will Go

Friday, July 6th, 2007

In a short while, Wuan and I will be going on our second roadtrip to the island I used to call home once. Now I am not so sure. So much has changed in Penang when we were back last month. I was like a tourist visiting for the first time. These are confusing times for me.

RapidKL Fails To Launch Accessible Buses

Friday, July 6th, 2007

Non-step RapidKL bus at 1-Utama
Photo by Wuan.

Rangkaian Pengangkutan Integrasi Deras Sdn Bhd or more commonly known as RapidKL is a subsidiary of Syarikat Prasarana Negara Berhad (SPNB). In turn SPNB or better known as ‘Prasarana’, is the ultimate holding company under Ministry of Finance Incorporated. If RapidKL is a reflection of how Malaysia is being managed, we are all in deep trouble. After 10 months of tinkering with the non-step buses, they still cannot get it right. Wheelchair users are still not allowed to use the buses.

RapidKL Corporate Communications Division Senior Manager Katherine Chew announced on September 24 last year that the bus company would be bringing in 100 non-step buses after the newly-formed Barrier-Free Environment and Accessible Transport Group (BEAT) organised a campaign to check on the accessibility of bus at the Bangsar LRT Station.

Subsequent to that BEAT met with RapidKL CEO Rein Westra in October 20 and presented him with a memorandum outlining the basic requirements of an accessible bus system that fulfils not only the transportation needs of disabled persons but also senior citizens, pregnant women and adults with prams, among others.

During the meeting, Westra requested to be given four weeks for him to present a proposal to the government on the accessible buses and get back to us. He also repeatedly reminded BEAT not to speak to the press regarding this issue for that duration and threatened to cut all communications with us should we not honour that moratorium. That was the first and last time we heard from him although we kept our part of the deal.

On March 10 this year RapidKL COO Mohd. Ali Mohd. Nor invited BEAT to view a prototype of the accessible bus at its head office in Subang. After testing out the bus, BEAT recommended improvements to the design of the ramp and wheelchair docking system. The edge of the ramp was not flushed with the rest of the ramp and could cause a wheelchair to tip backwards. The docking system was flimsy and could not secure a wheelchair firmly. Moreover, it was not designed to fit all wheelchairs.

During a trial ride of the RapidKL accessible buses on April 26 around the city, BEAT again informed RapidKL of the unsuitability of the ramp and docking system. At the trial ride it was also discovered that there are not many bus stops suitable for the accessible buses due to the extreme differences in height. The lowest the accessible buses can go was 15 inches. The highest bus stops, which forms part of the walkway, was only 10 inches. This mismatched heights made the ramp too steep for unassisted boarding.

On May 4, RapidKL COO Mohd. Ali Mohd. Nor announced at a pre-launch briefing that accessible bus service will be launched on June 1. The event was attended by Ministry of Women, Family and Community Development Parlimentary Secretary Datin Paduka Chew Mei Fun, members of the print and electronic media and about 50 representatives from various NGOs working together under the BEAT banner. Again, we informed RapidKL regarding our concerns with the unsuitability of the ramps and docking system.

The last meeting BEAT had with RapidKL was on June 13. Katherine Chew represented the bus company. At the meeting, we categorically rejected the accessible feature of the buses citing safety concerns. Following that meeting, BEAT sent an email to RapidKL with a 4-point recommendation:

1. Improve the gradient of the ramp to ensure safety of the wheelchair users and persons assisting while boarding and alighting from the bus. This can be achieved via various mechanisms that are commercially available for such purposes.

2. The ramp should be of the same level from end to end. Sudden drops or bumps should be eliminated. In the current design the sharper gradient at the edge of the ramp may cause wheelchairs to tip over even with assisted boarding.

3. Install four point strap-type tiedown to firmly secure wheelchairs. The current single wheel docking clamp is insufficient to fully restrain the wheelchair in the event of collision or sudden braking.

4. To include BEAT members in all stages of design and installation of such features to ensure safety and functionality.

All in all, BEAT has informed RapidKL on more than four occasions regarding the ramps and docking system. Until today, nothing has been done to rectify the problems we pointed out. The buses are already on the road picking up passengers. However, as the buses were never officially launched despite what was announced during the pre-launch briefing, bus drivers refused to pick up wheelchair users because according to them, their management has instructed them not to do so.

Reading the chronology of the entire fiasco, I can only come to a conclusion that RapidKL never thought out properly all the factors of an accessible bus system when they hastily announced the acquisitions of 100 accessible buses. The design of the bus stops were never put into consideration at the time of acquisition. RapidKL unilaterally designed the ramps and docking systems according to their own understanding of how these features should be.

Now, RapidKL has 100 non-step buses that were supposed to be usable by wheelchair users but are not. How much money was spent in installing these buses with a non-functional accessible features? The biggest mistake on RapidKL’s part was in not consulting with disabled persons on the design. Disabled persons, especially wheelchair users, were never consulted on the suitability of the accessible and safety features. This kind of attitude goes against the motto of the 2004 International Day of Disabled Persons which was “Nothing about us without us.”

The management of RapidKL must understand that ultimately people in wheelchairs and other forms of disability are the end users. We are the people who will be using these buses everyday. We have no other alternatives to move around conveniently, especially people who have severe disabilities. We must be consulted every step of they way to ensure that the features installed to serve our needs are safe and functional.

The irony of all this is that RapidKL, Prasarana or even the government has no long-term plan to ensure that their entire bus fleet will be fully accessible but at the same time we keep seeing new but non-accessible buses being put into service. While the public transport needs of the general public are continually being improved, disabled persons are still being left behind – marginalised from mainstream society by the tidak apa attitudes of the people tasked with providing public transport with money that came out from taxpayers’ pockets.

The government must shoulder the blame entirely for this debacle. The Ministry of Finance, Ministry of Transport, Minstry of Entreprenuer and Co-operative Development and the Ministry of Housing and Local Government, among others, are responsible in part in their respective capacities to ensure an accessible public transportation system. After spending so much money to bring in non-step buses and fitting them with accessible feature, these buses are still not functional due to so many reasons and problems that are associated with so many ministries who are not actively doing their part in solving the said problems. It is time Prime Minister Dato’ Seri Abdullah Ahmad Badawi step in to ensure that public transportation problems of disabled persons are settled once and for all.

Pak Lah, we are humbly pleading with you to lift us out of this predicament. Help us solve this where your other ministers have failed. We, the disabled people of Malaysia, needs an accessible public transport system to help us go to school to get an education; allow us to commute to our places of employment; participate in social, cultural, religious and political activities. We need an accessible public transport to become part of society. Apa macam Pak Lah?

Tags: , ,

Blogging In The Nude

Tuesday, July 3rd, 2007

I blog in the nude sometimes. No, I am not kidding! When inspiration strikes in the shower I cannot help but rush out to the laptop, dripping wet, to put thoughts into words. Fortunately, I have the sense to wipe my hands dry first before furiously tapping away at the keyboard. Maybe we have chatted a bit too when I was in the buff. Gross? Blame the humid weather for this post. I am too lethargic and my mind to fuzzed to be bothered with decency. Bah!



Total pages: [5]<<12345>>